lørdag den 18. februar 2012

Subframe 3

My girlfriend wasn't home by 7:30 last night, so I took the chance and went to the Pirate shop, in order to fix the lowering legs for the cowl.
Cut and ready to be welded:

Welded topbrackets and in the straight angle bend:

Testfitting with clamps in order to try the placement of them and the cowl:

They needs some grinding of the weld in order to fit, but the height seems to match the cut in the front.




It was not supposed to be this low, but I think, I might end up liking it like this!


Next thing is to measure for the exact placement, grind the welds, weld the legs to the subframe, and then start fixing the bottom of the cowl, fitting the doors (when they are fix at the bottom), make the roof with the wooden skeleton, and then slowly start the rest of the body, which will be mostly sheet metal work.
Still thinking about fitting a rollbar on the inside of the rear wall - just in case of a crash, it might come in handy!

Keep 'em kruzin!
Dannerr

Ingen kommentarer:

Send en kommentar